CMP191: NETSO Consultation in relation to any potential changes to the CUSC which takes place in forums other than the CUSC Modifications Panel

This Modification Proposal proposes that a revision to the CUSC is required to ensure that signatories to the CUSC are consulted with, via the CUSC Modifications Panel, and have their views considered in relation to any potential changes to the CUSC which may occur as a result of activity or discussion which takes place in forums other than the CUSC Modifications Panel and its associated (CUSC) groups.  In particular, any input and potential or likely changes in relation to the development of the European Network Codes, in which National Grid (NGET) participate under their remit as the National Electricity Transmission System Operator (NETSO) are to be included.

Modification status:
Concluded - CMP191: NETSO Consultation in relation to any potential changes to the CUSC which takes place in forums other than the CUSC Modifications Panel
Last updated:
20 March 2024

Code Administrator Contact: Thomas Derry - [email protected]

Governance Route: Standard 

Impacts:

* High: National Grid Electricity Transmission plc (as NETSO)

* Medium: GB Stakeholders (incl. Generators, Distribution Network Operators, GB Transmission System Operators, Interconnector owners and Users, Offshore Transmission Owners, Suppliers); GB market participants; BSC, CUSC and Grid Code Parties; Ofgem; DECC

Rejected 

Code modification proposed by:
Garth Graham