CAP163: Transmission Access – Entry Capacity Sharing
It is proposed to introduce a zonal access product, allowing Generators to connect without wider system access rights and facilitating intra zonal access sharing between Generators on a 1:1 basis.
Modification status:
Concluded
- CAP163: Transmission Access – Entry Capacity Sharing
Last updated:
20 March 2024
Code Administrator Contact: Beverley Viney - [email protected]
Governance Route: Standard