Super SEL

Super SEL is utilised to directly decrease the sum of the minimum MW level or Stable Export Limit (SEL) of generators synchronized to the system by lowering the minimum generating level at a generator synchronised.

The table below shows Generators that have signed SUPER SEL (Stable Export Limit) agreements in place, including those agreed in 2020. This will be updated as further agreements are entered into.

Note: the enactment fee has been removed from the below table as we are now publishing instruction information on our data portal.

Generator
Station
Year Agreed

VPI Immingham

Immingham

2017

Drax Power Limited

Drax

2017
EP UK (formerly Centrica)

South Humber Bank 2

2017

EP UK (formerly Centrica)

Langage

2017

Calon Energy

Sutton Bridge

2017

Uniper UK Limited

Grain

2017

Drax Generation Enterprise (formerly ScottishPower Generation)

Damhead Creek

2018

Rocksavage Power

Rocksavage

2018

Saltend

Saltend

2020
Uniper UK Limited

Cottam Development Centre

2020
Uniper UK Limited

Connah's Quay

2020
EP UK

South Humber Bank 1

2020

Below is draft of the contract terms, and if you are interested in providing this service, please contact [email protected]