GSR020: Modification of Clause 7.8.1.1 to Allow Single Transformer Offshore Substations of Capacity Greater Than 90MW

This working-group shall consider whether the current clauses 7.8.1.1 and 7.13.1.1 and the defined term “Offshore Grid Entry Point (OffGEP) Capacity” should be modified to ensure that the most economic and efficient solutions for the connection of all offshore wind farm connections can be facilitated.

Modification status: Concluded

Last updated: 26 February 2020

Documents

Proposal

Workgroup meeting and summery reports

Code administrator consultation

Sorry, no documents found.

Workgroup consultation

Sorry, no documents found.

Draft final modification report/Final modification report

Sorry, no documents found.

Decision

Sorry, no documents found.