GC0114: System Operation Guideline: Prequalification Processes

Modification status: Current

Last updated: 9 May 2019

 

This modification was raised by:

National Grid in May 2018

Purpose of Modification:

The EU System Operation Guideline (SOGL) requires NGET to develop prequalification processes for Frequency Containment (FCR), Restoration (FRR) and Replacement Reserves (RR). In line with stakeholder feedback NGET proposes to develop these new processes under the established governance of the Grid Code.

The governance route for this modification is:

Standard

The impact of this modification is on:

Existing and future balancing service providers, NGET and DNOs.

The modification is currently at:

Awaiting Authority Decision