GC0113: The open, transparent, non-discriminatory and timely publication of the generic and user specific values required to be specified by the relevant TSO(s) and / or relevant system operator et al., in accordance with the DCC

Modification status: Current

Last updated: 15 March 2019

 

This modification was raised by:

SSE in April 2018

Purpose of Modification:

This modification will set out within the Grid Code the obligations in the EU Connection Codes as they relate to the specification of certain items by certain obligated party or parties.

The governance route for this modification is:

Standard

The impact of this modification is on:

Transmission Owners (including OFTOs and Interconnectors), Distribution Network Operators, Transmission System Users System Operator and Generators

The modification is currently at:

Workgroup Stage