GC0107: The open, transparent, non discriminatory and timely publication of the generic and/ or PGM specific values required to be specified by the relevant TSO(s) and / or relevant system operator et al., in accordance with the RfG

Modification status: Current - Workgroup Stage

Last updated: 11 July 2019

This modification was raised by:

SSE in November 2017

Purpose of Modification:

This modification will set out within the Grid Code the obligations in the EU Connection Codes as they relate to the specification of certain items by certain obligated party or parties.

The governance route for this modification is:

Standard

The impact of this modification is on:

Transmission Owners (including OFTOs and Interconnectors), Distribution Network Operators, Transmission System Users System Operator and Generators

The modification is currently at:

Workgroup Stage