GC0099: Establishing a common approach to interconnector scheduling consistent with the single intraday market coupling processes set out within Regulation EU 2015 1222 CACM

Modification status: Current

Last updated: 25 September 2018

This modification was raised by:

Robert Selbie (National Grid) in April 2017

Purpose of Modification:

This modification seeks to introduce the interconnector scheduled transfer process to the Grid Code in order to establish common timings which are compatible with both the EU single intraday market coupling processes, and GB and EU balancing processes. CACM aims to promote effective competition in the generation, trading and supply of electricity and foresees the development of more liquid intraday markets which give parties the ability to balance their positions closer to real time should help to integrate renewable energy sources into the Union electricity market.

The governance route for this modification is:

Standard

The impact of this modification is on:

Transmission system owners and operators most notably interconnector owners. This modification is linked to TSO compliance with EU Regulation 2015/1222 (CACM).

The modification is currently at:

 Implementation