GC0065: Consequential Changes from STC Modification CA049

Modification status: Concluded

Last updated: 25 September 2018

This proposal seeks to modify the Grid Code to place an obligation on developers of Offshore Transmission Networks to provide OFTOs with the capability to vary the reactive flows at the Interface Point within two minutes.

Documents