The open,transparent,non discriminatory and timely publication of the harmonised rules for grid connection (in accordance with the RfG, DCC and HVDC) and the harmonised rules on system operation set out within the Bilateral Agreements

Modification status: Current

Last updated: 25 September 2018

The open, transparent, non discriminatory and timely publication of the harmonised rules for grid connection (in accordance with the RfG, DCC and HVDC) and the harmonised rules on system operation (in accordance with the SOGL) set out within the Bilateral Agreement(s) exhibited in the CUSC. 

This modification will set out within the CUSC the obligations in the EU Connection Network Codes and System Operation Guideline as they relate to the harmonised rules for connection and system operation in GB.

Documents

Workgroup Consultation

Sorry, no documents found.

Workgroup Meetings

Sorry, no documents found.

Industry Consultation

Sorry, no documents found.

Final Modification Report

Sorry, no documents found.

Decision

Sorry, no documents found.