Improving local circuit charge cost-reflectivity

Modification status: Current

Last updated: 21 December 2018

This modification seeks to make part of the TNUoS charge more cost-reflective through removal of additional costs from local circuit expansion factors that are incurred beyond the connected, or to-be-connected, generation developers’ need.