Charging

These pages contain details about the charges that users of the electricity transmission system have to pay, how they are calculated and what changes are currently being considered by the industry.

The charges

Three National Grid workers assessing a number of display screens

Balancing Services Use of System (BSUoS) charges

BSUoS recovers the cost of day-to-day operation of the transmission system. These charges apply to suppliers and generators.

Find out more

Two National Grid representatives looking at a span of computer screens

Transmission Network Use of System (TNUoS) charges

TNUoS recovers the cost of installing and maintaining the transmission system. These charges apply to suppliers and generators.

Find out more

A yellow London tram in transit with buildings and another tram out of focus in the background

Electricity connection charges

Connection Charges recover the cost of installing and maintaining connection assets.

Find out more

An exposed lightbulb with fine white lines behind it over an orange-yellow background

Assistance for Areas with High Electricity Distribution Costs (AAHEDC)

AAHEDC charges recovers assistance costs for The North of Scotland which is currently the only area specified to receive assistance. These charges apply to suppliers.

Find out more

A waterfront view of the London Bridge at dusk with well-lit buildings in the background

Connection and Use of System Code (CUSC)

The CUSC is the contractual framework for connection to, and use of, the National Electricity Transmission System (NETS).

Find out more

A partial view of a laptop on a yellow surface

Charging guidance

Includes open letter consultations and guidance, charging methodology policy decisions, electricity industry information guides, and Triads data.

Find out more